Friday, 10 August 2012

I got more bricks.....

The facing bricks have arrived these are imperial soft red bricks and slightly different dimensions to the modern engineering brick.




Preparations for the block and beam floor are completed they've hacked out holes for the block and beam to rest in




I walked around the site with the supervisor today and asked him to ensure that the site is cleared up a bit.

We're going to need to have the plumber in to re-route the fuel oil line, last night I noticed a strong smell of oil when I got in which didn't bode well - looks like the builders uncovered a previously punctured line and the smell of oil is permeating the bricks.

The brick layer made up a sample wall for the architect and conservation officer to approve



End of week 5