Preparations for the block and beam floor are completed they've hacked out holes for the block and beam to rest in
I walked around the site with the supervisor today and asked him to ensure that the site is cleared up a bit.
We're going to need to have the plumber in to re-route the fuel oil line, last night I noticed a strong smell of oil when I got in which didn't bode well - looks like the builders uncovered a previously punctured line and the smell of oil is permeating the bricks.
The brick layer made up a sample wall for the architect and conservation officer to approve