Well at least the groundworkers are consistent, they didn't put in an appearance on Monday this week.
On Tuesday 4 guys showed up and they started to level off the ground inside the extension, filled in the trenches next to the walls and generally totally churned up the garden with their digger.
Today they've had a load of concrete delivered and they've levelled off and filled in the area inside the walls, this is to prevent plants growing inside the void space under the floor and to allow any water to run off through the weep holes.
The block and beam flooring is due to be delivered tomorrow. They think that the floor can be laid in one day. The boss groundworker was very critical of the Architect since he felt that he had been left to design the floor because the Architect hadn't anticipated the basement encroaching on the area under the extension. "What was he doing when he did the f'ing survey?"