Friday, 3 August 2012

Slow but steady progress

The wall below ground floor is nearing completion.  The guys had to battle with 'elf and safety training on Weds (sure it was riveting) so we lost a half day there.

We've been blessed with the presence of the Architects twice this week, I think they could be called "Pelicans" given the association of a large bill with their appearance.



The white tubes allow condensation or water to escape via "weep holes"

4 blokes trying to look intelligent while peering into a hole

2 Architects and 2 buiders working out how to build around the basement brickwork

The perimeter is taking shape

Master bricklayer at work "setting out"

Looks pretty straight

You can see the footings for the fireplace and chimney, they're going to fill the hole with concete